Rain pipe is a good helper for agricultural irrigation. Save water resources, save labor and save cost. If rain pipe is properly laid, can greatly improve irrigation efficiency. So, do you know how to lay rain pipe?
1. Before laying the rain pipe, we should remove the pests in the soil with drugs to prevent them from harming crops and biting the pipe.
2. When laying, the hole of rain pipe should be up, and the tail should be blocked. Then the water pump is used to squeeze water. The inlet is installed with strainer to prevent the hole from clogging. In case of blockage, untie the tail head and rinse with clean water for one minute. You can also tap the tube wall gently with your hands and other tools.
3. In the first use, according to the pressure of your pump and the working length of the rain pipe, open the switch first. It is better to open several more switches to prevent the rain pipe from bursting due to too much pressure. Turn off a few switches if the pressure is not enough. You’ll know how many switches you turn on the next time you use it. Change the first switch after water test, and then turn off the test of all the switches, to prevent improper use caused by blasting.
4. When changing stubble, first squeeze the rain pipe with water pump, clean it, roll it up, put it in a cool place to prevent rats and other things from biting, and prepare for the next time.